The Illinois APC 430 form, known as the Notification of Demolition and Renovation, is a required submission for those undertaking significant changes to buildings or structures, particularly with regards to asbestos management, to the Illinois Environmental Protection Agency (EPA). It ensures compliance with the National Emission Standards for Hazardous Air Pollutants (NESHAP) by detailing the presence of asbestos, the plan for its removal, and specifics about the demolition or renovation process. For guidance on completing and submitting this crucial document, click the button below.

Open Editor
Contents

In the realm of public health and environmental safety, the notification of demolition and renovation activities holds paramount importance, particularly when asbestos is involved. The Illinois Apc 430 form serves as a critical conduit for this notification process, mandated by the Illinois Environmental Protection and Agency. It operates within the framework of the National Emission Standards for Hazardous Air Pollutants (NESHAP) regulations outlined in 40CFR-Subpart M-61.145, reflecting updates as of November 20, 1990. This comprehensive form requires detailed submissions covering the nature of the notification, whether original, revised, or canceled, and the type of operation such as renovation, demolition, annual, ordered demolition, or emergency renovation. It extends to provide an in-depth facility description including the presence of asbestos, estimated work hours, schedules for demolition or asbestos removal, details on contractors involved, and the planned procedures for handling the asbestos-containing materials. Moreover, the form mandates disclosures related to waste transportation and disposal, while ensuring that the planned work adheres to procedural and training requirements designed to prevent asbestos emissions. Notably, the requirement of a filing fee underscores the form’s role in formalizing notices of such hazardous operations, ensuring they are accounted for and managed in accordance with environmental safety standards. This form not only encapsulates the operational and safety information in an organized manner but also signifies a mechanism of regulatory compliance and public health protection.

Illinois Apc 430 Sample

REC. NO. NOTIFICATION OF DEMOLITION AND RENOVATION

IL 532 1296 APC 430

Illinois Environmental Protection Agency

P.O. Box 19276, Springfield, IL 62794-9276

Rev.06/03

THIS INFORMATION IS REQUIRED; NESHAP-40CFR-SUBPART M-61.145, Rev. Nov. 20, 1990

ALL SECTIONS MUST BE COMPLETED TO AVOID NOTICE VIOLATION

1.TYPE OF NOTIFICATION (O-Original/R-Revised/C-Canceled):

2.TYPE OF OPERATION (R-Renovation/D-Demo/A-Annual/O-Ordered Demo/E-Emergency Renovation):

3.FACILITY DESCRIPTION (Building Name):

Address:

City:

 

County:

 

 

State:

 

ZIP:

 

 

 

 

 

 

 

Location of Asbestos Containing Material (ACM) in structure:

 

 

 

 

 

 

 

 

 

 

 

 

Bldg. Size:

 

# of Flrs.

 

Age:

Present Use:

 

 

 

 

 

 

 

 

 

 

Prior Use:

 

Future Use (Demo):

 

 

 

 

 

 

 

 

 

 

4. IS ASBESTOS PRESENT?

Y N

5. WORK HOURS:*

a.m.

 

p.m.

 

 

 

 

 

6. SCHEDULED DATE DEMOLITION:

 

Start:

Complete:

 

 

 

 

7. SCHEDULED DATE ASBESTOS REMOVAL:

Start:

Complete:

 

 

 

 

 

8. REGULATED ASBESTOS

 

NONFRIABLE ASBESTOS NOT

NONFRIABLE ASBESTOS TO BE

 

TO BE REMOVED (Demolition):

REMOVED:

 

 

CONTAINING MATERIAL TO BE

 

 

 

 

 

 

 

 

REMOVED (RACM):

 

CATEGORY I

 

CATEGORY II

CATEGORY I

 

CATEGORY II

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pipes (Ln. Ft.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Surface Area (Sq. Ft.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Volume (Cu. Ft.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9. ASBESTOS REMOVAL CONTRACTOR:

 

 

 

 

 

 

 

 

 

 

 

 

 

Address:

 

 

 

 

City:

 

 

 

 

 

 

 

 

 

 

State, Zip:

 

Contact:

 

 

Phone:

 

 

 

 

 

 

 

 

 

10. DEMOLITION CONTRACTOR:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Address:

 

 

 

 

City:

 

 

 

 

 

 

 

 

 

 

State, Zip:

 

Contact:

 

 

Phone:

 

 

 

 

 

 

 

 

 

 

11. OWNER NAME:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Address:

 

 

 

 

City:

 

 

 

 

 

 

 

 

 

 

State, Zip:

 

Contact:

 

 

Phone:

 

 

 

 

 

 

 

 

 

 

12. WASTE TRANSPORTER:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Address:

 

 

 

 

City:

 

 

 

 

 

 

 

 

 

 

State, Zip:

 

Contact:

 

 

Phone:

 

 

 

 

 

 

 

 

 

 

13. WASTE DISPOSAL SITE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Address:

 

 

 

 

City:

 

 

 

 

 

 

 

 

State, Zip:

 

Landfill Permit #:

Phone:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

-AGENCY USE ONLY-

 

 

 

Date Received:

Input to ACTS:

 

To Region 1 2 3

 

 

 

 

 

 

 

 

Post Mark Date:

To Cook/City:

 

Champaign:

 

LaSalle:

 

 

 

 

 

 

 

Springfield:

Rockford:

 

 

Moline:

 

Marion:

 

 

 

 

 

 

 

 

 

14.PROCEDURE, INCLUDING ANALYTICAL METHOD, USED TO DETECT THE PRESENCE OF ASBESTOS.

ILLINOIS LICENSE NUMBER OF INSPECTOR: NAME OF ANALYTICAL TESTING LABORATORY:

15.DESCRIPTION OF PLANNED DEMOLITION OR RENOVATION WORK:

METHODS TO BE EMPLOYED INCLUDING DEMOLITION OR RENOVATION TECHNIQUES.

16.DESCRIPTION OF WORK PRACTICES AND ENGINEERING CONTROLS TO BE USED TO PREVENT EMISSIONS AT THE DEMOLITION OR RENOVATION SITE:

17. IS DEMOLITION ORDERED BY A GOVERNMENTAL AGENCY?

Y N (If Yes, a signed copy of Order must be attached.)

 

 

Governmental representative ordering the activity:

 

 

 

 

Title:

Date of Order:

Ordered Demolition Date:

18.FOR EMERGENCY RENOVATIONS: Date and Hour of Emergency:

Description of the Sudden, Unexpected Event (e.g. structure in danger of eminent collapse):

19.DESCRIPTION OF PROCEDURES TO BE FOLLOWED IN THE EVENT THAT UNEXPECTED ASBESTOS IS FOUND OR PREVIOUSLY NONFRIABLE ASBESTOS MATERIAL BECOMES CRUMBLED, PULVERIZED, OR REDUCED TO POWDER.

20.I CERTIFY THAT AT LEAST ONE REPRESENTATIVE, TRAINED IN THE PROVISIONS OF 40 CFR PART 61, SUBPART M, SHALL BE ON-SITE DURING DEMOLITION OR RENOVATION, HAVING IN HIS OR HER POSSESSION, FOR INSPECTION, EVIDENCE THAT THE REQUISITE TRAINING HAS BEEN ACCOMPLISHED.

I CERTIFY THE ABOVE INFORMATION IS CORRECT.

Signature of Owner/Operator Date

(Original Signature Only, Photocopy Not Valid)

A FILING FEE OF $150 MUST BE PAID WITH EACH INITIAL 10-WORKING DAY NOTIFICATION REQUIRED BY THE ASBESTOS NESHAP. MAKE CHECKS PAYABLE TO ILLINOIS EPA AND MAKE NOTATION THAT IT IS FOR THE 10-WORKING DAY NOTIFICATION FEE. CASH AND CREDIT CARDS ARE NOT ACCEPTABLE. IF THE FEE IS NOT SUBMITTED WITH THE NOTIFICATION, THE NOTIFICATION WILL BE DEEMED IMPROPERLY FILED.

*Not required under NESHAPS.

Mail this form to: IL Environmental Protection Agency, Attn: Asbestos Unit, P.O. Box 19276, Springfield, IL 62794-9276

Form Details

Fact Name Detail
Form Identification APC 430
Form Title Notification of Demolition and Renovation
Agency Illinois Environmental Protection Agency (EPA)
Governing Law NESHAP-40CFR-Subpart M-61.145, Rev. Nov. 20, 1990
Requirement All sections must be completed to avoid notice violation
Types of Operations Covered Renovation, Demolition, Annual, Ordered Demolition, Emergency Renovation
Filing Fee $150 for each initial 10-working day notification
Asbestos Presence Mandatory to specify if asbestos is present and details of asbestos-containing material
Mail to Illinois EPA, Attn: Asbestos Unit, P.O. Box 19276, Springfield, IL 62794-9276

Illinois Apc 430 - Usage Guidelines

After completing the Illinois APC 430 form, you are taking a significant step in ensuring safety and compliance during demolition or renovation projects. It is essential to provide detailed and accurate information to avoid any legal or environmental issues. The process involves detailing the presence of asbestos, the contractors involved, and specific work practices to minimize asbestos emissions. Following the step-by-step guide below will help streamline this necessary procedure.

  1. Decide the Type of Notification by marking the appropriate box with O (Original), R (Revised), or C (Canceled).
  2. Select the Type of Operation by indicating R (Renovation), D (Demolition), A (Annual), O (Ordered Demo), or E (Emergency Renovation).
  3. Fill in the Facility Description, including the building name, address, size, number of floors, and its past, present, and future use.
  4. Indicate whether asbestos is present with a Y (Yes) or N (No).
  5. Specify Work Hours by entering the start and end times.
  6. Provide the Scheduled Date for Demolition including both the start and complete dates.
  7. List the Scheduled Date for Asbestos Removal, detailing the start and complete dates.
  8. Detail the amount and type of asbestos to be removed under the categories of Regulated Asbestos, Nonfriable Asbestos Not, and Nonfriable Asbestos to be Removed.
  9. Enter information about the Asbestos Removal Contractor, including address and contact details.
  10. Fill in details of the Demolition Contractor, including address and contact details.
  11. Provide the Owner's Name, address, and contact information.
  12. List the Waste Transporter's details, including address and contact.
  13. Indicate the Waste Disposal Site information, including address, landfill permit number, and contact.
  14. Describe the Procedure Used to Detect the Presence of Asbestos, including the Illinois license number of the inspector and the name of the analytical testing laboratory.
  15. Provide a Description of Planned Demolition or Renovation Work, including methods and techniques to be employed.
  16. Detail the Work Practices and Engineering Controls to be used to prevent emissions at the site.
  17. Indicate if the demolition is Ordered by a Governmental Agency with a Y (Yes) or N (No) and attach a signed copy of the order if applicable.
  18. For Emergency Renovations, provide the date, hour, and a brief description of the emergency event.
  19. Describe the Procedures to Follow if Unexpected Asbestos is Found or if previously nonfriable asbestos material becomes hazardous.
  20. Sign and date the form to certify the information provided is correct. Remember, the signature must be original; photocopies are not valid.
  21. Include a filing fee of $150 with the form, payable to the Illinois EPA, noting that it is for the 10-working day notification fee.
  22. Mail the completed form and payment to the indicated address for the Asbestos Unit at the Illinois Environmental Protection Agency.

Once the form and payment are submitted, your project is on its way to compliance with the necessary environmental and safety regulations. Ensure all information is accurate and complete to prevent any delays or legal issues. Remember, handling asbestos requires careful attention to detail and adherence to all regulatory guidelines.

Get Answers on Illinois Apc 430

  1. What is the Illinois APC 430 form?

    The Illinois APC 430 form, titled "Notification of Demolition and Renovation," is a mandatory document for reporting intended demolition or renovation activities to the Illinois Environmental Protection Agency (EPA). This comprehensive form is essential under the National Emission Standards for Hazardous Air Pollutants (NESHAP), specifically regulated by 40 CFR Part 61, Subpart M, concerned with the control of asbestos emissions. It ensures that all necessary information regarding the project's scope, asbestos presence, contractor details, and safety measures is formally communicated to the agency, enabling proper oversight and compliance with environmental laws.

  2. Who needs to fill out the APC 430 form?

    Any owner or operator planning to undertake demolition or renovation work on a facility in Illinois that might potentially disturb asbestos-containing materials must fill out and submit the APC 430 form. Such scenarios might include buildings undergoing modifications, upgrades, or complete demolition. Importantly, this form is required when the operation has the potential to release asbestos fibers into the air, thereby imposing risks to public health and the environment.

  3. What information is required on the APC 430 form?

    The APC 430 form requires detailed information to be fully completed for effective processing. The key sections include:

    • Type of Notification indicating whether it’s original, revised, canceled, etc.
    • Type of Operation specifying renovation, demolition, emergency renovation, etc.
    • Facility Description with detailed location info, size, and asbestos material locations.
    • Presence of Asbestos and details on its location and quantity within the structure.
    • Scheduled dates for beginning and completion of demolition or asbestos removal.
    • Information on the asbestos removal and demolition contractors, including the waste transporter and disposal site.
    • Details on work practices and engineering controls to prevent asbestos emissions.
    • A section for additional necessary information like emergency renovations and unexpected findings of asbestos during the work.

    Comprehensive completion of the form is crucial to ensure regulatory compliance and the safety of the demolition or renovation process.

  4. How and where to submit the APC 430 form?

    The completed APC 430 form, along with the required $150 filing fee for the 10-working day notification as mandated by the Asbestos NESHAP, should be mailed to the Illinois Environmental Protection Agency, specifically to the Asbestos Unit at the P.O. Box address provided in Springfield, IL. It's important to note that the original signature is necessary on the form, and photocopies are not acceptable. Additionally, the form clarifies that both cash and credit cards are not permitted means of payment; thus, checks must be made payable to Illinois EPA, indicating clearly that the fee is for the 10-working day notification.

Common mistakes

Filling out the Illinois APC 430 form, which is used for notifying the Illinois Environmental Protection Agency (IEPA) about demolition and renovation projects, especially those involving asbestos, is a critical step in ensuring that these activities are done safely and in compliance with environmental laws. However, during this process, people often make a number of mistakes that can lead to potential compliance issues or even legal penalties. Being aware of these common errors can help in preventing unnecessary complications or delays. Here are six mistakes frequently made:

  1. Not completing all sections: The APC 430 form explicitly states that all sections must be filled out to avoid a notice violation. Overlooking sections or assuming they're not applicable can lead to incomplete submissions, which may result in fines or project delays.

  2. Incorrect type of notification: The form requires specifying the nature of the notification - original, revised, canceled, etc. Failing to accurately indicate the type can lead to processing errors or miscommunication with regulatory agencies.

  3. Misidentifying the type of operation: Whether the activity is a renovation, demolition, emergency renovation, or another type of operation, it's crucial to correctly identify this on the form. Mistakes here can affect the legal requirements and safety protocols that need to be followed.

  4. Omitting details about asbestos: Given the form’s focus on asbestos regulation, accurately reporting the presence of asbestos, its location, and the extent of asbestos-containing material is imperative. Inaccurate reporting can have significant health and environmental consequences.

  5. Incorrect or incomplete contractor information: The form requires detailed information about the asbestos removal and demolition contractors, including address and contact details. Providing inaccurate information or leaving sections blank can lead to compliance issues and hinder communication.

  6. Failure to attach required documents: If the demolition is ordered by a governmental agency or involves emergency renovations, attaching the necessary documents, such as signed orders or descriptions of the emergency, is essential. Forgetting these attachments can invalidate the notification.

To avoid these mistakes, it’s recommended to review the entire form carefully before submission, double-check all provided information, and ensure that all required attachments are included. Taking these steps can help ensure that the demolition or renovation project proceeds without regulatory hitches.

Documents used along the form

When handling asbestos-related activities in Illinois, such as demolition or renovation projects that potentially disturb asbestos-containing materials, it's crucial to follow specific guidelines and submit the appropriate forms to ensure compliance with the law. The Illinois APC 430 form, or the Notification of Demolition and Renovation, is an essential document for these processes, but it's often not the only one needed. Various other forms and documents play vital roles throughout these activities, helping to safeguard public health and the environment.

  • Asbestos Project Permit Application: Before starting any project involving asbestos removal or disturbance, this application must be submitted to gain the necessary permit. It outlines the scope of the project, including methods and timelines for asbestos removal, ensuring that the work is planned according to safe practices.
  • Notification of Asbestos Abatement for Schools: Specific to school building projects, this form ensures that any asbestos-related work in schools complies with the Asbestos Hazard Emergency Response Act (AHERA). It helps protect students, teachers, and staff members from exposure.
  • Waste Shipment Records: This document tracks the transport and disposal of asbestos-containing waste. It ensures that the waste is properly handled from the point of generation to its final disposal at an approved facility, minimizing environmental impact.
  • Asbestos Waste Transporter Registration: Transporters of asbestos-containing materials must be registered with the state. This registration confirms that the transporter has the necessary qualifications and follows all regulations for safely handling and transporting asbestos waste.
  • Occupational Health and Safety Plan: This plan outlines the measures and procedures in place to protect workers from asbestos exposure during demolition or renovation projects. It includes details on personal protective equipment (PPE), air monitoring, and medical surveillance.
  • Building Inspector's Asbestos Survey Report: Before renovation or demolition, a thorough inspection for asbestos-containing materials must be conducted by a licensed inspector. This report details the presence, location, and condition of any asbestos found, informing the project's safety measures and compliance requirements.

In summary, while the Illinois APC 430 form initiates the notification process for projects involving potential asbestos exposure, a suite of additional documents ensures comprehensive planning, execution, and completion of these projects. Together, they help maintain a safe environment for both workers and the general public, aligning with state and federal guidelines for asbestos management.

Similar forms

The Illinois APC 430 form, required by the Illinois Environmental Protection Agency, shares similarities with other documents focused on environmental safety and regulation compliance. Each of these documents plays a crucial role in ensuring public health and the environment are protected from the risks associated with building materials such as asbestos.

The National Emission Standards for Hazardous Air Pollutants (NESHAP) Notification of Demolition and Renovation form is closely related to the Illinois APC 430 form. They both serve the purpose of overseeing demolition and renovation projects to ensure they comply with regulations aimed at minimizing asbestos emissions. These forms require detailed information on the presence of asbestos, the schedule for asbestos removal, procedures for handling the material, and details regarding the contractors involved. The primary similarity lies in their function to protect public health and the environment by mandating strict adherence to asbestos management practices during any construction project that could disturb asbestos-containing materials.

OSHA Form 300, known as the Log of Work-Related Injuries and Illnesses, although serving a broader function, shares a common goal with the Illinois APC 430 form: ensuring workplace safety and health. While OSHA Form 300 deals with recording and reporting work-related injuries and illnesses, the APC 430 form focuses specifically on asbestos management during demolition or renovation. Both documents necessitate accurate record-keeping and reporting to respective federal and state agencies, aiming to minimize harm to workers and the public. They stand as vital tools in the ongoing effort to safeguard environmental and occupational health.

Dos and Don'ts

When you're filling out the Illinois APC 430 form for Notification of Demolition and Renovation, here are five essential practices to ensure your form is correctly completed:

  1. Ensure all sections are filled out completely to avoid a notice of violation. Omitting information can delay your project.
  2. Accurately identify whether asbestos is present on the premises. This step is crucial for safety and regulatory compliance.
  3. Provide precise details about the planned demolition or renovation work, including the methods and techniques to be employed.
  4. Indicate the procedure used to detect the presence of asbestos, including the Illinois license number of the inspector and the name of the analytical testing laboratory.
  5. Include the scheduled dates for the start and completion of both demolition and asbestos removal work to keep everyone informed and on track.

Conversely, there are practices you should avoid to eliminate potential issues:

  • Do not leave any section incomplete. Each part of the form provides vital information required under NESHAP-40CFR-SUBPART M-61.145 regulations.
  • Avoid guessing when it comes to the presence of asbestos. If unsure, have the property professionally inspected before completing the form.
  • Do not provide vague information about the demolition or renovation methods and the work practices to be used. Specific details are necessary for a clear understanding of the project.
  • Avoid neglecting to attach a copy of the governmental order if the demolition is ordered by a government agency. This documentation is essential for compliance verification.
  • Do not forget to sign the form and attach the initial $150 filing fee required for each 10-working day notification. Incomplete submissions or lack of payment will result in the notification being improperly filed.

By adhering to these guidelines, the process of notifying relevant authorities about demolition and renovation projects in Illinois can be streamlined, ensuring compliance and safety at every step.

Misconceptions

Understanding the Illinois APC 430 form, which is designed for notifying the Illinois Environmental Protection Agency (EPA) about demolition and renovation projects involving asbestos, can be challenging. Misconceptions about this process can lead to delays and compliance issues. To help clarify, here are ten common misconceptions about the Illinois APC 430 form:

  1. All demolition projects require an APC 430 form. This is not the case; the requirement to submit an APC 430 form applies when a project involves the demolition or renovation of a structure that might contain asbestos. Projects without this risk may not need to file the form.

  2. If asbestos is not present, I don’t need to file the form. Even if asbestos is not present in the structure, if the project falls under the categories requiring notification, one must still complete and submit the APC 430 form, indicating that asbestos is not present.

  3. Filing the APC 430 form is optional. Filing this form is mandatory for certain types of demolition and renovation projects, particularly those that could disturb asbestos-containing materials. Failure to submit the APC 430 can lead to a violation notice.

  4. Only the demolition or renovation companies are responsible for submitting the APC 430 form. In reality, the responsibility for submitting the APC 430 form usually falls on the property owner or the operator who has the overall control of the construction or demolition site.

  5. I can submit the APC 430 form at any time before the project starts. The form must be submitted at least 10 working days before the start of any demolition or renovation activity. This timeframe allows the EPA to review the notification and ensure all safety protocols for asbestos handling are in place.

  6. Electronic submissions of the APC 430 form are accepted. As of the last update, the APC 430 form must be mailed to the Illinois EPA's Asbestos Unit with the required fee. Electronic submissions or photocopies are not accepted as valid filings.

  7. The filing fee is negotiable or can be waived. The $150 filing fee for the APC 430 form is mandatory and non-negotiable. Failure to include the fee with the notification will result in the notification being deemed improperly filed.

  8. Revised notifications do not require a new filing fee. If substantive changes to the project occur after the initial notification, a revised APC 430 form must be submitted. However, there is no additional filing fee required for submitting revised notifications.

  9. Only large-scale demolitions need to be reported. Any demolition or renovation project that meets the criteria set by the Illinois EPA, regardless of scale, requires the submission of an APC 430 form. This includes small projects if they potentially involve asbestos.

  10. Completion of APC 430 form is all that's required for compliance. Completing and submitting the APC 430 form is only one step in ensuring compliance with asbestos-related regulations. Owners/operators must also ensure that asbestos removal and handling are performed according to state and federal laws.

Clearing up these misconceptions is crucial for managing demolition and renovation projects within Illinois lawfully and safely. Detailed planning and compliance with the APC 430 form requirements are essential steps in protecting public health and the environment from the dangers of asbestos.

Key takeaways

The Illinois APC 430 form plays a significant role in ensuring environmental safety and compliance during demolition and renovation projects that might involve asbestos. Understanding the requirements and implications of this form is crucial for individuals and entities engaged in such activities. Here are some key takeaways:

  • Every section of the APC 430 form must be filled out in detail to avoid any notice of violation. This requirement underscores the importance of providing comprehensive information about the demolition or renovation project.
  • The form serves as a notification to the Illinois Environmental Protection Agency (EPA), thereby facilitating regulatory oversight and environmental protection.
  • Identifying whether asbestos is present on the site is a critical step. This determination guides the necessary safety and removal procedures to protect workers and the public from asbestos exposure.
  • Project owners must specify the type of operation—be it renovation, demolition, emergency renovation, ordered demolition, or an annual notification. This classification helps tailor regulatory requirements to the specific project.
  • The scheduled dates for demolition or asbestos removal outlined in the form aid in project planning and coordination with regulatory authorities.
  • Details about the asbestos removal contractor, if applicable, including contact information, are necessary for ensuring that the contractor is qualified and compliant with relevant asbestos handling protocols.
  • A correct description of the demolition or renovation work, including specific methods and techniques to be employed, is essential for assessing the potential environmental impact.
  • Work practices and engineering controls to prevent asbestos emissions are mandated, signifying the emphasis on minimizing air pollution and related health risks during the project.
  • In cases where demolition is ordered by a governmental agency, attaching a signed copy of the order to the form is a requirement, ensuring that the project is executed under lawful authority.
  • The submission of the form is accompanied by a filing fee, which supports the administrative processing and oversight activities of the Illinois EPA. This fee is integral to keeping the notification process funded and functional.
  • The form mandates the presence of at least one on-site representative trained in the provisions of 40 CFR Part 61, Subpart M, highlighting the priority given to expert oversight and compliance during the project.

In conclusion, the completion and submission of the Illinois APC 430 form constitute a fundamental step in complying with environmental regulations. By detailing the nature of the demolition or renovation, ensuring that appropriate measures are in place for handling asbestos, and providing essential information about the contractors involved, the form facilitates a safer and more regulated approach to construction projects that might impact public health and the environment.